The PCC thanks the Ontario Trillium Foundation for the generous grant to make the building fully accessible with a new ramp into the building and an accessible washroom on the main floor.
The ribbon cutting ceremony for the new accessibility addition took place on October 22, 2021 with MPP John Yakabuski and Mayor Mike Lemay.


New Ramp Entrance

New Ramp Entrance

Old Building Exterior

East End View

West End View

Entry to Lower Level

Lower Level to New Addition

Accessible Washroom Entrance

Accessible Washroom Entrance

Accessible Washroom
